Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the envato-wordpress-toolkit domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the g5plus-darna domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6121
Water treatment at a greenhouse in Ethiopia, Africa – Waterfiltech
Waterfiltech - Liquid filtration manufacturer.

Enter your keyword

    Water treatment at a greenhouse in Ethiopia, Africa

    Water treatment at a greenhouse in Ethiopia, Africa

    IN Project
    portfolio
    Investor Name:
    Published Date:
    1970-01-01
    Location:
    Value:
    Architecture:
    About Project

    Project Description

    Waterfiltech has been awarded a contract for the engineering, manufacturing and assembly for a brackish water reverse osmosis system, including chlorine dioxide and UV disinfection for a grower in the Democratic Republic of Ethiopia, Africa. The treated water is used as process water for the horticultural applications on the farm. The water treatment system is equipped with top brand instrumentation and equipment.

    Scope of Work

    • Engineering, manufacturing and assembly
    • Chemical dosing stations
    • Multimedia filtration
    • 5 micron cartridge filtration
    • Reverse osmosis system
    • Post RO treatment system
    • UV disinfection
    • ClO2 disinfection
    • CIP station
    • Automated flush
    • Microprocessor controlled
    • Site commissioning and installation supervision

    Project duration

    February 2010 to September 2010

    Project location

    Democratic Republic of Ethiopia, Africa

    Product quality

    TDS < 200 uS/cm

    Project application

    Potable and horticultural water